If you don’t know much about Tampa solar panels, the installation process may seem intimidating. However, your chosen solar panel company will walk you through the steps, ensuring you stay informed from start to finish. If you’re ready to switch to solar, here’s what to expect.
Assessment and Design
The positioning of solar panels impacts their effectiveness, so company professionals will want to assess your roof. Additionally, some municipalities have regulations governing panel design and configuration. The company will research this information and develop a plan that meets all requirements.
This is also the time to mention any concerns you may have. The engineers will take them into account to minimize inconveniences.
Once they’ve completed the design, you can review it with a company representative. While it’s possible to change the design after or during installation, it’s more efficient to do so before work begins, so don’t hesitate to ask questions at this point.
Permit
A permit is part of the solar panels for home cost. Since the solar panel company takes care of applying for the permit, you don’t have to worry about paying a separate bill — the price gets factored into the total cost of design and installation.
One thing to keep in mind is that permits can take a while to process. The exact time frame depends on your local authority having jurisdiction, and how many applications it has to process. The solar panel company will monitor the status of the permit and act as your single point of contact.
Installation and Inspection
Upon permit approval, the solar panel company can start installation. Depending on the size of your roof and the amount of panels, this step can take up to two days.
The materials will arrive earlier than installation day to ensure everything is ready to go. Both material delivery and installation require scheduling, and the solar company will coordinate with you for the most convenient date and time.
Once the workers have finished setting up the system, your AHJ will schedule an inspection. An inspector will visit your home and check the setup for the following:
- Adherence to fire, building and electrical codes
- Compliance with zoning laws
- Observation of safety codes
Permission To Operate
If the setup passes inspection, you can move on to the final step. In addition to getting the go-ahead from the AHJ, you need your local electricity provider’s permission to operate. The solar panel company will take care of this as well.
It’s essential to wait for PTO before powering on the solar panel system. Electricity providers may fine homeowners who activate their panels prior to receiving permission, as they need to install a bi-directional energy meter before you start taking advantage of your new energy source.
The first step to calculating the solar panels for home cost is contacting local providers for quotes. Installing panels is a big initial investment, but the benefits more than make up for the price. If you’re ready for lower energy bills and a small carbon footprint, consider getting solar panels today.